Mobile
Log In Sign Up
Home > english-chinese > "slope cutting" in Chinese

Chinese translation for "slope cutting"

边坡开挖
开挖边坡
斜坡挖土


Related Translations:
bar slope:  斜撑斜度
slope conveyer:  倾斜输送机倾斜运输机
slope curvature:  坡曲率
slope front:  坡前沿
band slope:  岸坡
volcanic slope:  火山坡
slope design:  边坡设计
slope registration:  斜坡登记
sloping layers:  斜砌层
sloping beam:  斜梁
Example Sentences:
1.Slope cutting and soil nail construction
位于鳌?石的削土斜坡工程
2.The optimality method are introduced on slope cutting project in the paper
将优化理论引入到削坡方案的选择上。
3.Slope cutting machine
斜度切削机
4.Meirengong building is the high - rise of the old city reconstructive project firstly presented to xiahe road in xiamen . because it is located in downtown area , detonation or slope cutting are not permitted
美仁宫大厦为厦门市厦禾路旧城改造的首栋高层建筑,因地处闹市区,不允许爆破,也不能放坡开挖。
5.The research and test results show that single - direction mining and slope cutting in the middle of face may reduce workers ' labor , shorten the working looping time , fasten the working schedule and improve efficiency
研究和实测结果表明,在薄煤层工作面采用单向割煤、中部斜切进刀方式,不但降低了工人的劳动强度,而且减少了循环作业时间,提高了生产进度和效益。
6.The minimum erathwork of slope cutting is regarded as target function , and the anticipated factor of safety of slope as a constraint condition , so this problem is equivalent to optimality one with constraint conditions . thus the optimal scheme of slope cutting can be obtained
这里将最小的削坡土方量作为目标函数,将预期的边坡安全系数作为约束条件,把削坡问题等价于一个有约束的优化问题,可找出最优的削坡方案。
7.The choice dam type is especial importance , during the designed research of the rock - fill dam , particular under the rock - fill dam with very deeply cover layer , the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive , whether the . design of dam is scientific and reasonable , it is very important for cutting interpenetration and stability of the dam , , the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone , based on the study and analysis the design of cutting seep in the foundation with deep cover with earth , cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country , for the project of the clay vertical middle wall and vertical cutting interpenetration , the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration , respectively in terms of the different stage of complete period sluice period and working condition , adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project . have comparatively all - around comprehended the various model dam , particular the distribute rule of stress and strain of the cutting interpenetration system , provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body , the result of research and advice have very importance value in design and building for the similarity project
工程设计中,坝型的选取显得尤为重要,特别对于坝基有深厚覆盖层的堆石坝,心墙和坝基防渗墙的应力和变形是坝体、坝基最敏感的部位,设计方案是否安全、科学和合理,对大坝防渗和稳定起到至观重要的作用。本文研究分析了国内外深厚覆盖层基础防渗设计、坝基混凝土防渗墙与坝体防渗体衔接形式及工程实际应用效果,为下坂地水利枢纽工程深厚覆盖层基础防渗设计的方案选择提供了参考;在吸收和归纳了国内外堆石坝的设计研究成果的基础上,对粘土心墙和坝基垂直防渗方案、沥青混凝土心墙和坝基垂直防渗方案以及粘土斜心墙和坝基水平铺盖防渗方案,分别按竣工期和蓄水运行期的不同工作情况进行了有限元非线性计算分析;对左岸高陡边坡的大坝防渗体与基础混凝土防渗墙的不同结合型式进行了三维有限元静力计算分析和研究;对混凝土防渗墙不同弹性模量对墙体应力和变位的影响进行了三维有限元静力计算分析和研究。通过对不同方案的计算分析和研究,比较全面的了解了各方案坝体,尤其是防渗体的应力和变形分布规律,为坝型选择、坝体结构设计、基础防渗墙与坝体防渗体的结合型式以及塑性区大小的确定提供了重要依据。
Similar Words:
"slope crack in valley wall" Chinese translation, "slope crest" Chinese translation, "slope current" Chinese translation, "slope curvature" Chinese translation, "slope curve" Chinese translation, "slope cutting machine" Chinese translation, "slope decline" Chinese translation, "slope deflection" Chinese translation, "slope deflection equation" Chinese translation, "slope deflection method" Chinese translation